Showing 205–216 of 318 results
-

| Feature | Specifications |
| Material | Stainless Steel |
| Size | Round 160/180cm | Rect. 240x120cm | Customized |
| MOQ | 5 Pieces |
| Lead Time | 20–30 Days |
| Colors | Gold, Silver, Rose Gold, White, Black |
| Tabletop | Glass, Mirror, MDF, Acrylic, Artificial Stone |
| Assembly | Knock-down (KD) – Saves Shipping Cost |
-


| Feature | Specifications |
| Material | Metal frame + crystal/acrylic drops + LED (by design) |
| Size | Dia 40–120 cm (common range) |
| Lead Time | 7-15Days |
| Colors | Gold/Silver/Black/Chrome + custom matching |
| Feature | Luxury look, strong photo effect, modular installation (by design) |
| Assembly | knock down |
-


| Feature | Specifications |
| Material | premium resin /PP, UV-resistant |
| Size | standard wedding chair size (customizable) |
| MOQ | 100 Pieces |
| Lead Time | 20-30 Days |
| Colors | white/black/clear/gold/silver/multi-color |
| Cushion Options | PU leather/velvet/linen (removable or fixed) |
| Stack/Assembly | stackable (8–10 pcs), fixed structure |
| Upholstery Color | optional |
-


| Feature | Specifications |
| Material | Stainless Steel |
| Size | D90*H75 |
| MOQ | 5 Pieces |
| Lead Time | 20–30 Days |
| Colors | Gold, Silver, Rose Gold, White, Black |
| Tabletop | Glass, Mirror, MDF, Acrylic, Artificial Stone |
| Assembly | Knock-down (KD) – Saves Shipping Cost |
-


| Feature | Specifications |
| Material | premium resin /PP, UV-resistant |
| Size | standard wedding chair size (customizable) |
| MOQ | 100 Pieces |
| Lead Time | 20-30 Days |
| Colors | white/black/clear/gold/silver/multi-color |
| Cushion Options | PU leather/velvet/linen (removable or fixed) |
| Stack/Assembly | stackable (8–10 pcs), fixed structure |
| Upholstery Color | optional |
-


| Feature | Specifications |
| Material | 201 stainless steel (304 stainless steel optional) |
| Size | customizable (based on quotation); layout customizable |
| MOQ | 5 Pieces |
| Lead Time | 20–30 Days |
| Colors | Gold/Silver/Rose Gold/Black (mirror / brushed available) |
| Options | shelves in glass/acrylic |
| Assembly | not stackable |
-


| Feature | Specifications |
| Material | Stainless Steel |
| Size | Standard |
| MOQ | 5 Pieces |
| Lead Time | 20–30 Days |
| Colors | Gold, Silver, Rose Gold, White, Black |
| Tabletop | Glass, Mirror, MDF, Acrylic, Artificial Stone |
| Assembly | Knock-down (KD) – Saves Shipping Cost |
-


| Feature | Specifications |
| Material | Stainless Steel Frame + Acrylic / Mirror / Tempered Glass Panels (by design) |
| Size | Customized (made to your specific venue requirements) |
| Style Customization | Supported (send photo/sketch; straight, rectangular, round foldable styles) |
| Lead Time | 25–35 Days |
| Colors | Gold/Silver/Rose Gold/Black (mirror / brushed available) |
| LED Option | Optional (hidden LED strip integration under the counter or front panel) |
| Feature | Heavy-duty, elegant metallic look, foldable/modular design for easy transport |
-


| Feature | Specifications |
| Material | stainless steel or wood frame + upholstery (depending on style) |
| Size | width 120–160 cm; depth 60–80 cm; height 80–95 cm (customizable) |
| MOQ | 50Pieces |
| Lead Time | 25–35 Days |
| Colors | gold/silver/black/white; custom colors available |
| Fabric Options | velvet/linen/loop velvet/PU leather; tufted backrest optional |
| Stack/Assembly | not stackable |
| Upholstery Color | optional |
-


| Feature | Specifications |
| Material | Wooden |
| Size | Customize |
| MOQ | 5 Pieces |
| Lead Time | 20–30 Days |
| Colors | Gold, Silver, Rose Gold, White, Black |
| Tabletop | Glass, Mirror, MDF, Acrylic, Artificial Stone |
| Assembly | Knock-down (KD) – Saves Shipping Cost |
-


| Feature | Specifications |
| Material | Wooden |
| Size | Customize |
| MOQ | 5 Pieces |
| Lead Time | 20–30 Days |
| Colors | Gold, Silver, Rose Gold, White, Black |
| Tabletop | Glass, Mirror, MDF, Acrylic, Artificial Stone |
| Assembly | Knock-down (KD) – Saves Shipping Cost |
-


| Feature | Specifications |
| Material | Stainless Steel |
| Size | Customized |
| MOQ | 5 Pieces |
| Lead Time | 20–30 Days |
| Colors | Gold, Silver, Rose Gold, White, Black |
| Tabletop | Glass, Mirror, MDF, Acrylic, Artificial Stone |
| Assembly | Knock-down (KD) – Saves Shipping Cost |